Repair & Renovation

Replace Stucco Facade Bldg. 95 Denver Federal Center

This project entailed replacing the exterior stucco facade of Denver Federal Center Building 95, a two-story (plus penthouse), 150,800 square-foot structure originally constructed in 1998. The project was designed in strict accordance with GSA Facilities Standards P100. As such, continuous insulation was included in the scope. The innovative SMARTci GreenGirt system with rockwool insulation was selected for the continuous insulation product and a cementitious panel rainscreen system for the cladding. WUFI analyses and thermal modeling were conducted to guide product selection, placement of the water-resistive barrier (WRB) within the entire continuous insulation/cladding wall assembly, and installation practices.

Demolition and installation of new cladding required extensive coordination between subcontractors to keep the building interior protected from the weather while maximizing construction safety and efficiency. Building 95 sits just at the edge of the Colorado Rocky Mountain Front Range known for sporadic high winds and precipitation events, which required the WRB to be installed in tandem with demolition. Heritage’s thorough design and coordination during construction were key to the overall success of the contract.

Project Information

Location: Denver, Colorado

Contract Amount: $2,410,400.00


Wallops Command and Data Acquisition Station Fire Alarm System

Heritage Contracting provides all management, supervision, labor, materials, supplies, and equipment for designing and replacing the Fire Alarm System (FAS) for all Wallops Command and Data Acquisition Station (WCDAS) Buildings that have an existing FAS. During this multi-phase project, Heritage installed a temporary wireless Fire Alarm System to protect the entire WCDAS Operations/Admin Building, prior to the removal of the existing FAS components. 

Additionally, Heritage designed and installed a new and permanent Fire Alarm System to protect the entire WCDAS Operations/Admin Building. The WCDAS Facility has 38 buildings of various sizes with 22 of which had an existing fire alarm and suppression system. All 38 buildings required the installation of a new Fire Alarm System, in order to provide one consistent site-wide Fire Alarm System with one manufacturer.

Project Information

Location: Wallops, Virginia

Contract Amount: $3,647,232.24


MCA-09 Renovations

This project was an emergency request to accommodate a new command requiring a fast-track construction schedule and close coordination with Marine Corps tenant. NAVFAC designed the project while Heritage was completing the demolition and construction. Work was successfully completed within 11 months. 

Project Information

Location: Norfolk, Virginia

Contract Amount: $2,245,984.05